Skip to content

Drain Cleaning Alameda is a referral service, not a plumbing company. The person you speak with works for an independent local business.

Drain Cleaning Alameda

Selling, remodelling or a new meter

The EBMUD sewer lateral certificate

Alameda is part of EBMUD's regional private sewer lateral program. Certain events require proof that your upper lateral doesn't leak: a compliance certificate.

When you need one

You can also get one voluntarily, for instance after a repair, so it is done before a sale.

  • Buying or selling a home. EBMUD requires it to close escrow; buyer and seller agree who arranges it.
  • Building or remodelling work above EBMUD's value threshold, at the final permit sign-off.
  • Changing the size of your water meter.

How it usually goes

  1. Look up the parcel

    EBMUD's lateral portal shows whether a certificate is on file and lets you schedule the test.

  2. Camera first

    The company usually films the lateral to see whether it can pass as it is or needs repair.

  3. Repair if needed

    With a City building permit, and a property-line cleanout if the house has none.

  4. The test

    An air pressure or water test of the upper lateral, run by the contractor and witnessed by EBMUD.

  5. The certificate

    EBMUD issues it once the lateral is shown not to leak.

Selling before the work is done

If the lateral can't be fixed before closing, EBMUD offers a time extension certificate: six months from issue to get the compliance certificate, backed by a deposit. The City can't grant extensions; only EBMUD can.

If the house received a certificate under Alameda's own program before 2015, ask EBMUD how it is treated; exemptions based on those certificates run to the original expiry date.

Alameda Point and condos

At Alameda Point, certificates go through City Engineering first ((510) 747-7930); EBMUD needs the City-signed Alameda Point form before it schedules the test. Condos and other shared developments follow EBMUD's separate guidelines.

EBMUD's lateral program: 1-866-403-2683, weekdays, or its private sewer lateral page.

Certificate questions

Can a lateral that drains fine still fail?

Yes. The test is about leaks, not flow. Old joints can let water out, and groundwater in, while sewage still runs.

Does the company or EBMUD run the test?

The contractor usually sets it up and runs it, and EBMUD witnesses it. Make sure whoever you hire knows the program.

Need the lateral filmed or tested?

Say on the call that it's for the EBMUD certificate and whether a sale is under way, so the company can plan the camera, any repair and the test together.

Water backing up or a drain that won't clear?

Call (510) 345-5065

Calls may be recorded. Who pays for this number and what happens to your details.

Call (510) 345-5065